Enbridge Gas Inc. – 2024-2028 Natural Gas Distribution Rates - Phase …
View the complete record for Phase One, EB-2022-0200. Type: Rates. This application will be heard using the Cost-Based> $500 million Revenue Requirement performance standard (pdf). View an expanded timeline (pdf) of the procedural steps for this Rates application.
the OEB approved 2025 rates on an interim basis until the remaining Phase 2 issues and applicable Phase 3 issues are resolved. The OEB likewise approved Enbridge’s January 2025 QRAM application on an interim basis.
In evidence and testimony in Phase 2, Enbridge Gas has explained why inaccessible meters are an unusual and key factor beyond the Company’s control that is in fact persisting and making the MRPM metric unattainable.
The ouncil notes that in Procedural Order No. 1 the OE stated, “To be clear, the Phase 2 issues previously approved in the January 27, 2023 Issues List Decision, as revised by the August 17, 2023 Decision approving the Phase 1 Settlement Proposal, are final.
Aug 12, 2024 · through 2028. The proceeding on the application was split into three phases. Phase 1 of the proceeding was completed with a Board Decision and Order in December 2023. Enbridge filed evidence for Phase 2 on April 26, 2024 in Docket Number EB-2024-0111. On May 30, the Board finalized the Issues List for the proceeding, with 27 specific issues ...
Hydro One Networks Inc. - Waasigan Expropriation
Phase 2 consists of constructing a new 230 kV single-circuit transmission line spanning approximately 170 km from the existing Mackenzie TS to the existing Dryden TS. The anticipated in-service date for Phase 1 is December 2025, while Phase 2 is expected to be in-service by December 2027.
Procedural Order No. 2 set out the issues list for the proceeding, dividing the review of the application into Phase 1 and Phase 2. A settlement conference was held from May 29, 2023 to June 9, 2023 with respect to the Phase 1 issues in the proceeding. Enbridge Gas and 23 intervenors participated in the settlement conference (collectively,
Phase 2 issues. An Issues Conference was held on January 9, 2023 with the objective of discussing the draft issues list and agreeing to a proposed issues list for the OEB’s consideration.
• Phase 1: OEB cost allocation principles and methodologies • Phase 2: Select rate design and rate classification matters • Phase 3: OEB filing requirements, model design, and data inputs
Dec 19, 2024 · implements a new rate adjustment approved by the OEB in Phase 2 of Enbridge Gas’s 2024 Rebasing proceeding. 14 With the above noted rate changes taken into account, 10 The typical residential customer’s consumption 2,4is 00 m3 per year in the EGD rate zone and 2,200 m3 per year in the Union rate zones.