Open links in new tab
  1. Copilot Answer
    DisplacementSurfaced: 2300 tons · Submerged: 3950 tons
    Length98 m
    Draught7 m
    History

    Sarov was designed by the Rubin Design Bureau during the 1980s and its construction began in 1989 at the Krasnoye Sormovo Shipyard, Nizhniy Novgorod. In 1998, work on the submarine was stopped due to the f… See more

    Design

    Based on the Kilo-class submarine, it is a unique platform due to the combination of its diesel electric power system and a small nuclear reactor. It is believed the reactor does not drive the propeller itself, but rather produces el… See more

    Operational history

    On 27 November 2016, Sarov was allegedly involved in a testing of the Russia's nuclear-powered, nuclear-armed Poseidon unmanned underwater vehicle, according to the Pentagon officials.
    On 20 Febr… See more

  1. Related searches for B 90 Sarov

  2. Some results have been removed