Enbridge Gas Inc. – 2024-2028 Natural Gas Distribution Rates - Phase …
View the complete record for Phase One, EB-2022-0200. Type: Rates. This application will be heard using the Cost-Based> $500 million Revenue Requirement performance standard (pdf). …
the OEB approved 2025 rates on an interim basis until the remaining Phase 2 issues and applicable Phase 3 issues are resolved. The OEB likewise approved Enbridge’s January 2025 …
In evidence and testimony in Phase 2, Enbridge Gas has explained why inaccessible meters are an unusual and key factor beyond the Company’s control that is in fact persisting and making …
The ouncil notes that in Procedural Order No. 1 the OE stated, “To be clear, the Phase 2 issues previously approved in the January 27, 2023 Issues List Decision, as revised by the August …
Aug 12, 2024 · through 2028. The proceeding on the application was split into three phases. Phase 1 of the proceeding was completed with a Board Decision and Order in December …
Hydro One Networks Inc. - Waasigan Expropriation
Phase 2 consists of constructing a new 230 kV single-circuit transmission line spanning approximately 170 km from the existing Mackenzie TS to the existing Dryden TS. The …
Procedural Order No. 2 set out the issues list for the proceeding, dividing the review of the application into Phase 1 and Phase 2. A settlement conference was held from May 29, 2023 to …
Phase 2 issues. An Issues Conference was held on January 9, 2023 with the objective of discussing the draft issues list and agreeing to a proposed issues list for the OEB’s consideration.
• Phase 1: OEB cost allocation principles and methodologies • Phase 2: Select rate design and rate classification matters • Phase 3: OEB filing requirements, model design, and data inputs
Dec 19, 2024 · implements a new rate adjustment approved by the OEB in Phase 2 of Enbridge Gas’s 2024 Rebasing proceeding. 14 With the above noted rate changes taken into account, …