The expansion is intended to allow SCC to replace the production from the Molave coal mine that was depleted in 2023, and of the Narra coal mine, which is expected to be depleted next year.
The expansion project is designed to operate the company’s existing Molave and Narra pits, with plans to eventually run the new Acacia pit once the coal deposits in the existing pits are depleted.